| | EXPLOSIVES SAFETY SUBMISSION (ESS) |
| | 0,39 | | MB |
| | 50 | | stron |
| | 2184 | | ID | UNITED STATES ARMY CORPS OF ENGINEERS |
| | 2003 | | rok |
| | TABLE OF CONTENTS |
| | CHAPTER 1. GENERAL |
| | Introduction.1-1 1-1 |
| | ESS Overview.1-2 1-1 |
| | Regulatory Authorities1-3 1-2 |
| | CHAPTER 2. REQUIREMENTS FOR SUBMISSION OF AN ESS |
| | Introduction.2-1 2-1 |
| | OE Response Action Projects Requiring an ESS2-2 2-1 |
| | OE Response Action Projects Not Requiring an ESS.2-3 2-1 |
| | CHAPTER 3. TYPES OF ESS’s |
| | Introduction.3-1 3-1 |
| | Removal Action ESS.3-2 3-1 |
| | Institutional/Engineering Controls ESS3-3 3-2 |
| | NDAI ESS.3-4 3-3 |
| | TCRA ESS.3-5 3-3 |
| | CHAPTER 4. PREPARATION OF AN ESS |
| | Introduction.4-1 4-1 |
| | Organizational Responsibilities.4-2 4-1 |
| | Parties Responsible for Preparation of the ESS4-3 4-2 |
| | Contents of the ESS.4-4 4-2 |
| | Technical References4-5 4-3 |
| | CHAPTER 5. ESS APPROVAL PROCESS |
| | Introduction.5-1 5-1 |
| | FUDS Projects Executed by the USACE Removal District5-2 5-1 |
| | FUDS Projects Executed by an OE Design Center.5-3 5-1 |
| | Installation Projects 5-4 5-3 |
| | TCRA ESS.5-5 5-4 |
| | Addresses for Routing and Approval5-6 5-6 |
| | CHAPTER 6. CHANGES TO AN ESS |
| | Introduction.6-1 6-1 |
| | Amendment to an ESS.6-2 6-1 |
| | Correction to an ESS.6-3 6-2 |
| | APPENDIX A – REFERENCES.A-1 |
| | APPENDIX B – EXPLOSIVES SAFETY SUBMISSION FOR INSTITUTIONAL/ENGINEERING |
| | CONTROLS (EXAMPLE FORMAT).B-1 |
| | APPENDIX C – EXPLOSIVES SAFETY SUBMISSION FOR NO DOD ACTION INDICATED |
| | (EXAMPLE FORMAT).C-1 |
| | APPENDIX D – EXPLOSIVES SAFETY SUBMISSION FOR A TIME-CRITICAL REMOVAL ACTION |
| | (EXAMPLE FORMAT).D-1 |
| | GLOSSARY.Glossary-1 |