| | MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) SUPPORT |
| | 0,51 | | MB | DURING HAZARDOUS, TOXIC, AND RADIOACTIVE WASTE (HTRW) |
| | 68 | | stron | AND CONSTRUCTION ACTIVITIES |
| | 2185 | | ID | UNITED STATES ARMY CORPS OF ENGINEERS |
| | 2004 | | rok |
| | TABLE OF CONTENTS |
| | Chapter 1. Introduction |
| | General1-1 1-1 |
| | Responsibilities .1-2 1-2 |
| | Functional Roles . 1-3 1-2 |
| | Chapter 2. Statement of Work/Independent Government Estimates |
| | Introduction.2-1 2-1 |
| | SOW2-2 2-1 |
| | Preparation of the IGE . 2-3 2-2 |
| | Chapter 3. Planning Considerations for MEC Support |
| | Introduction.3-1 3-1 |
| | Planning Documents . 3-2 3-1 |
| | MEC Support Work Plan 3-3 3-1 |
| | ESP3-4 3-3 |
| | Conventional ESS . 3-5 3-6 |
| | Personnel Qualifications and Work Standards 3-6 3-6 |
| | Training.3-7 3-7 |
| | Explosives Safety 3-8 3-7 |
| | PPE3-9 3-9 |
| | EP 75-1-2 |
| | Fire Prevention. 3-10 3-10 |
| | Emergency Procedures. 3-11 3-10 |
| | Hazardous Waste Manifest 3-12 3-13 |
| | Chapter 4. Geophysical Detection Equipment Introduction.4-1 4-1 |
| | Factors to Consider . 4-2 4-1 |
| | Types of Instrumentation 4-3 4-2 |
| | Geophysical Investigation Performance . 4-4 4-3 |
| | Geophysical Prove-Out (GPO) . 4-5 4-4 |
| | Equipment Standardization and QC Tests 4-6 4-5 |
| | Maintenance4-7 4-7 |
| | Chapter 5. Anomaly Avoidance Procedures During HTRW Investigation/Design Activities |
| | Introduction.5-1 5-1 |
| | UXO Team Composition 5-2 5-1 |
| | Planning 5-3 5-1 |
| | Responsibilities .5-4 5-1 |
| | Authority .5-5 5-2 |
| | Access Surveys . 5-6 5-2 |
| | Surface Soil Sampling. 5-7 5-3 |
| | Passive Soil Gas Sampling 5-8 5-4 |
| | Active Soil Gas Sampling and Direct Push Technology (DPT). 5-9 5-4 |
| | Subsurface Soil Sampling and Monitoring Well Installation 5-10 5-5 |
| | Test Pit and Trench Excavations 5-11 5-7 |
| | Groundwater Monitoring/Aquifer Characterization5-12 5-8 |
| | MEC Disposition . 5-13 5-9 |
| | Quality Management 5-14 5-9 |
| | Chapter 6. MEC Support During Construction Activities |
| | Introduction.6-1 6-1 |
| | UXO Team Composition 6-2 6-1 |
| | Planning 6-3 6-2 |
| | Responsibilities .6-4 6-2 |
| | Authority .6-5 6-3 |
| | Standby Support 6-6 6-3 |
| | Subsurface Removal in Support of Construction Activities6-7 6-4 |
| | MEC Destruction 6-8 6-7 |
| | Quality Management. 6-9 6-12 |
| | Chapter 7. Procedures When RCWM is Encountered |
| | Introduction.7-1 7-1 |
| | Response Procedures. 7-2 7-1 |
| | Appendix A – References.A-1 |
| | Appendix B – Statement Of Work - Anomaly Avoidance Activities B-1 |
| | Appendix C – Statement Of Work - MEC Support During Construction Activities .C-1 |
| | Glossary.Glossary-1 |