| | CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE) |
| | 0,05 | | MB |
| | 33 | | stron |
| | 3383 | | ID | UNITED STATES ARMY CORPS OF ENGINEERS |
| | 1998 | | rok |
| | PART 1 GENERAL |
| | 1.1 REFERENCES |
| | 1.3 SUBMITTALS |
| | 1.3 GENERAL REQUIREMENTS |
| | 1.3.1 Services of "Corrosion Expert" |
| | 1.3.2 Contractor's Modifications |
| | 1.3.3 Isolators |
| | 1.3.4 Anode and Bond Wires |
| | 1.3.5 Surge Protection |
| | 1.3.6 Summary of Services Required |
| | 1.3.7 Nonmetallic Pipe System |
| | 1.3.7.1 Coatings |
| | 1.3.7.2 Tracer Wire |
| | 1.3.8 Tests of Components |
| | 1.3.9 Drawings |
| | 1.3.10 Electrical Potential Measurements |
| | 1.3.11 Achievement of Criteria for Protection |
| | 1.3.12 Metallic Components and Typicals |
| | 1.3.13 Metallic Component Coating |
| | PART 2 PRODUCTS |
| | 2.1 MAGNESIUM ANODES |
| | 2.1.1 Anode Composition |
| | 2.1.2 Dimensions and Weights |
| | 2.1.3 Packaged Anodes |
| | 2.1.4 Zinc Anodes |
| | 2.1.5 Connecting Wire |
| | 2.1.5.1 Wire Requirements |
| | 2.1.5.2 Anode Header Cable |
| | 2.2 MISCELLANEOUS MATERIALS |
| | 2.2.1 Electrical Wire |
| | 2.2.1.1 Wire Splicing |
| | 2.2.1.2 Test Wires |
| | 2.2.1.3 Resistance Wire |
| | 2.2.2 Conduit |
| | 2.2.3 Test Boxes and Junctions Boxes |
| | 2.2.4 Joint, Patch, Seal, and Repair Coating |
| | 2.2.5 Backfill Shields |
| | 2.2.6 Epoxy Potting Compound |
| | 2.2.7 Test Stations |
| | 2.2.8 Joint and Continuity Bonds |
| | 2.2.9 Resistance Bonds |
| | 2.2.10 Stray Current Measurements |
| | 2.2.11 Electrical Isolation of Structures |
| | 2.2.11.1 Electrically Isolating Pipe Joints |
| | 2.2.11.2 Electrically Conductive Couplings |
| | 2.2.11.3 Insulating Joint Testing |
| | 2.2.12 Underground Structure Coating |
| | 2.2.12.1 Field Joints |
| | 2.2.12.2 Inspection of Pipe Coatings |
| | 2.2.13 Resistance Wire |
| | 2.2.14 Electrical Connections |
| | 2.2.15 Electrical Tape |
| | 2.2.16 Permanent Reference Electrodes |
| | 2.2.17 Casing |
| | PART 3 EXECUTION |
| | 3.1 CRITERIA OF PROTECTION |
| | 3.1.1 Iron and Steel |
| | 3.1.2 Aluminum |
| | 3.1.3 Copper Piping |
| | 3.2 ANODE STORAGE AND INSTALLATION |
| | 3.2.1 Anode Storage |
| | 3.2.2 Anode Installation |
| | 3.2.2.1 Single Anodes |
| | 3.2.2.2 Groups of Anodes |
| | 3.2.2.3 Welding Methods |
| | 3.2.3 Anode Placement - General |
| | 3.2.4 Underground Pipeline |
| | 3.2.5 Installation Details |
| | 3.2.6 Lead Wire Connections |
| | 3.2.6.1 Underground Pipeline (Metallic) |
| | 3.2.6.2 Resistance Wire Splices |
| | 3.2.7 Location of Test Stations |
| | 3.2.8 Underground Pipe Joint Bonds |
| | 3.3 ELECTRICAL ISOLATION OF STRUCTURES |
| | 3.3.1 Isolation Joints and Fittings |
| | 3.3.2 Gas Distribution Piping |
| | 3.4 TRENCHING AND BACKFILLING |
| | 3.5 TESTS AND MEASUREMENTS |
| | 3.5.1 Baseline Potentials |
| | 3.5.2 Isolation Testing |
| | 3.5.2.1 Insulation Checker |
| | 3.5.2.2 Cathodic Protection Meter |
| | 3.5.3 Anode Output |
| | 3.5.4 Reference Electrode Potential Measurements |
| | 3.5.5 Location of Measurements |
| | 3.5.5.1 Piping or Conduit |
| | 3.5.5.2 Tanks |
| | 3.5.5.3 Casing Tests |
| | 3.5.5.4 Interference Testing |
| | 3.5.5.5 Holiday Test |
| | 3.5.5.6 Recording Measurements |
| | 3.6 TRAINING COURSE |
| | 3.7 CLEANUP |
| | 3.8 MISCELLANEOUS INSTALLATION AND TESTING |
| | 3.8.1 Coatings |
| | 3.8.2 Excavation |
| | 3.9 SPARE PARTS |
| | 3.10 SEEDING |
| | 3.11 SYSTEM TESTING |
| | 3.12 CLEARING OF TREES AND UNDERBRUSH |