| | North European Gas Pipeline (NEGP): EIA Programme in a |
| | 4,38 | | MB | transboundary context (Espoo) |
| | 50 | | stron |
| | 3906 | | ID | Rambøll Danmark A/S |
| | 2006 | | rok |
| | Table of contents |
| | 1. Introduction 1 |
| | 2. Project description 2 |
| | 2.1 Background and purpose 2 |
| | 2.2 Current state of affairs 3 |
| | 2.3 Pipeline route 3 |
| | 2.4 Pipeline design and materials 3 |
| | 2.5 Installation Logistics 4 |
| | 2.6 Pre-commissioning 11 |
| | 2.7 Operational aspects 12 |
| | 2.8 Decommissioning 12 |
| | 2.9 Relation to other infrastructure 13 |
| | 3. Alternatives 14 |
| | 3.1 Alternatives considered 14 |
| | 3.2 The non-implementation alternative 15 |
| | 4. Regulatory context 16 |
| | 5. Existing situation of the project area 20 |
| | 6. Identification of impacts to be studied 25 |
| | 6.1 General 25 |
| | 6.2 Impacts to be studied offshore 25 |
| | 7. EIA and method to be applied 30 |
| | 7.1 General 30 |
| | 7.2 Delimitation of impact area 30 |
| | 7.3 Environmental baseline parameters 30 |
| | 7.4 Environmental impact 31 |
| | 7.4.1 Environmental impact of Russia, Finland, Sweden, Denmark and Germany (parties of origin) |
| | 32 |
| | 7.4.2 Environmental impact of Estonia, Latvia, Lithuania and Poland (other affected parties) 39 |
| | 7.5 Field investigations 40 |
| | 8. Proposals for preventing/mitigation negative impacts 41 |
| | 9. Content of the EIA in a transboundary context for the NEGP project 43 |