| | Technical and Regulatory Guidance for In Situ Chemical |
| | 2,38 | | MB | Oxidation of Contaminated Soil and Groundwater |
| | 171 | | stron |
| | 4173 | | ID | Interstate Technology and Regulatory Council |
| | 2005 | | rok |
| | TABLE OF CONTENTS |
| | ACKNOWLEDGMENTS . i |
| | EXECUTIVE SUMMARY . iii |
| | 1. INTRODUCTION AND TECHNOLOGY OVERVIEW.1 |
| | 1.1 Brief Descriptions of the Technologies 2 |
| | 1.2 Appropriate and Applicable Uses of ISCO Technology 16 |
| | 1.3 Integration of ISCO with Other Technologies19 |
| | 2. SITE CHARACTERIZATION AND CONCEPTUAL SITE MODEL21 |
| | 2.1 Specific Geologic and Chemical Data Needs.22 |
| | 2.2 Screening Tools for Site Characterization30 |
| | 3. HEALTH AND SAFETY ISSUES33 |
| | 4. REGULATORY BARRIERS35 |
| | 4.1 Safe Drinking Water Act/Underground Injection Control .36 |
| | 4.2 Resource Conservation and Recovery Act .36 |
| | 4.3 Comprehensive Environmental Response, Compensation and Liability Act.36 |
| | 4.4 Emergency Planning and Community Right-to-Know Act39 |
| | 4.5 Solutions to Regulatory Barriers 39 |
| | 5. APPLICATION DESIGN40 |
| | 5.1 Laboratory Treatability Studies 40 |
| | 5.2 Pilot-Scale Studies 41 |
| | 5.3 Design of Oxidant Concentration and Volume 42 |
| | 5.4 Design of Oxidant Delivery46 |
| | 6. MONITORING REQUIREMENTS55 |
| | 6.1 Process and Performance Monitoring.55 |
| | 6.2 Post-Treatment and Closure Monitoring 60 |
| | 7. TRIBAL AND STAKEHOLDER CONCERNS.60 |
| | 8. CASE STUDIES62 |
| | 9. REFERENCES 64 |
| | APPENDICES |
| | Appendix A. Acronyms |
| | Appendix B. Glossary |
| | Appendix C. Regulatory Examples |
| | Appendix D. Case Studies |
| | Appendix E. ITRC Contacts, Fact Sheet, and Product List |