| | Characterization, Design, Construction, and Monitoring of |
| | 2,96 | | MB | Mitigation Wetlands |
| | 197 | | stron |
| | 4183 | | ID | Interstate Technology and Regulatory Council |
| | 2005 | | rok |
| | TABLE OF CONTENTS |
| | ACKNOWLEDGEMENTS. i |
| | EXECUTIVE SUMMARY . iii |
| | 1. INTRODUCTION .1 |
| | 1.1 Historic Concerns with Mitigation Success2 |
| | 1.2 Problem Statement2 |
| | 1.3 Wetlands Overview.3 |
| | 2. WETLAND MITIGATION OVERVIEW 11 |
| | 2.1 National Mitigation Action Plan.12 |
| | 2.2 When to Mitigate 13 |
| | 2.3 Types of Mitigation 14 |
| | 2.4 On-Site, Off-Site Mitigation and Credit .16 |
| | 2.5 In Kind and Out of Kind .17 |
| | 2.6 Buffers 17 |
| | 2.7 Mitigation Banking.17 |
| | 2.8 Mitigation Fund 17 |
| | 3. PREDESIGN ASSESSMENT.18 |
| | 3.1 Desktop Data Collection.18 |
| | 3.2 Functional Evaluation of the Wetlands.19 |
| | 3.3 Collection of Field Data in Support of Wetlands Characterization 22 |
| | 4. MITIGATION DESIGN AND PLANNING.27 |
| | 4.1 Mitigation Ratios for Design Purposes.28 |
| | 4.2 General Design Sequencing29 |
| | 4.3 Site Protection.42 |
| | 4.4 As-Built Reports .42 |
| | 5. CONSTRUCTION.42 |
| | 5.1 Soil Erosion and Sediment Control 43 |
| | 5.2 Preparation of the Appropriate Grade.44 |
| | 5.3 Plants and Plant Installation45 |
| | 5.4 Post-Construction .46 |
| | 6. MONITORING.46 |
| | 7. WETLAND CREATION IN LAND RECLAMATION.51 |
| | 7.1 Mined Land.51 |
| | 7.2 Oil and Gas Drilling Sites.53 |
| | 7.3 Use of Dredged Material for Wetland Restoration.53 |
| | 8. ISSUES .54 |
| | 8.1 Oversight54 |
| | 8.2 Regulatory55 |
| | 8.3 Incidental Wetland55 |
| | 8.4 Constructed Treatment Wetlands56 |
| | 8.5 Mitigation Banking.56 |
| | 8.6 Functional Equivalency 57 |
| | 8.7 Replacement Ratios and No-Net-Loss57 |
| | 8.8 In-Kind vs. Out-of-Kind .57 |
| | 8.9 Off Site vs. On Site.58 |
| | 9. STAKEHOLDER ISSUES58 |
| | 9.1 Ecological Considerations Surrounding Wetland Mitigation.58 |
| | 9.2 Mitigation Banking.59 |
| | 9.3 Monitoring Duration.59 |
| | 9.4 Wetland Buffers59 |
| | 9.5 Small Wetland Exclusion59 |
| | 9.6 Deed Restrictions and Conservation Easements.59 |
| | 9.7 Performance Standards .60 |
| | 9.8 Public Considerations and Public Involvement 60 |
| | 10. BIBLIOGRAPHY.61 |
| | 11. OTHER RESOURCES 65 |
| | APPENDICES |
| | Appendix A. Acronyms |
| | Appendix B. Glossary |
| | Appendix C. Case Study Survey |
| | Appendix D. Sample Conceptual Wetland Mitigation Plan: Restoration Site |
| | Appendix E. Sample Detailed Wetland Mitigation Plan: Creation Site |
| | Appendix F. National Mitigation Action Plan |
| | Appendix G. U.S. Corps of Engineers Regulatory Guidance Letter No. 02-2 |
| | Appendix H. Response to Comments |
| | Appendix I. ITRC Contacts, Fact Sheet, and Products List |