TEXACO GASIFICATION PROCESS - INNOVATIVE TECHNOLOGY

0,93
MB EVALUATION REPORT

90
stron

4291
ID National Risk Management Research Laboratory

2000
rok

CONTENTS

Notice .

Figures .

Tables . .

List of Abbreviations, Acronyms, and Symbols . .

Conversion Factors . .

Acknowledgements .

Executive Summary . 1

1 Introduction . .

1 .1 Background

1.2 Brief Description of Program and Reports .

1.3 Purpose of the Innovative Technology Evaluation Report (ITER) .

1.4 Technology Description

1.5 Key Contacts

2 Technology Applications Analysis . .

2.1 Objectives - Performances versus ARARs

2.1.1 Comprehensive Environmental Response, Compensation, and Liability Actt .

2.1.2 Resource Conservation and Recovery Act .

2.1.3 Clean Air Act

2.1.4 Safe Drinking Water Act .

2.15 Clean Water Act .

2.1.6 Toxic Substances Control Act .

2.1.7 Occupational Safety and Health Administration Requirements .

2.2 Operability of the Technology .

2.3 Applicable Wastes .

2.4 Key Features

2.5 Availability and Transportability of Equipment ’.

2.6 Materials Handling Requirements .

2.7 Site Support Requirements .

2.8 Limitations of the Technology .

3 Economic Analysis .

3.1 Conclusion of Economic Analysis .

3.2 Basis of Economic Analysis

3.3 Issues and Assumptions .

3.4 Results .

3.4.1 Site Preparation Costs

3.4.2 Permitting and Regulatory Requirements .

3.4.3 Capital Equipment

3.4.4 Startup .

3.4.5 Labor .

3.4.6 Consumables and Supplies . .

3.4.7 Utilities .

3.4.8 Effluent Treatment and Disposal

3.4.9 Residual Waste Shipping and Handling . .

3.4.10 Analytical Services .

3.4.11 Maintenance and Modifications . .

3.4.12 Demobilization

DRE . .

Slag and Solid Residuals Leachability

4.3.1 Test Slurry Leaching Characteristics . .

4.3.2 SITE Demonstration Results .

Synthesis Gas Produsct . .

4.4.1 Synthesis Gas Composition .

4.4.2 Products of Incomplete Reaction (PIRs)

4.4.3 Particulate Emissions .

4.4.4 Acid Gas Removal

Metals Partitioning

Process Wastewater . .

Other Technology Requirements .

5.1 Environmental Regulation Requirements .

5.2 Personnellssues .

5.3 Community Acceptance .

Technology Statuss .

6.1 Petroleum Production Tank Bottoms Demonstration

6.2 El Dorado, Kansas Refinery Project .

Appendices

I Vendor Claims . 72

II Case Studies . 78