| | National Allocation Plan for CO2 Emission Allowances 2005 – |
| | 0,64 | | MB | 2007 Trading Period |
| | 60 | | stron |
| | 4354 | | ID | Ministerstwo Środowiska |
| | 2004 | | rok |
| | CONTENTS: |
| | 1. INTRODUCTION 5 |
| | 2. KEY FACTORS AND STRUCTURAL ELEMENTS OF THE NATIONAL ALLOCATION PLAN8 |
| | 2.1. OBJECTIVES AND REQUIREMENTS OF DIRECTIVE 2003/87/EC CONCERNING THE NAP. 8 |
| | |
| | 2.2. POLAND’S SITUATION IN COMPARISON WITH OTHER EU COUNTRIES 11 |
| | 3. THE ALLOCATION PLAN AT MACRO LEVEL – THE "TOP-DOWN" APPROACH 12 |
| | 3.1. INTRODUCTION 12 |
| | 3.2. CHANGE IN GREENHOUSE GAS EMISSIONS IN 1988-2001 AND PROJECTIONS FOR |
| | POLAND UNTIL 201213 |
| | 3.2.1. Greenhouse gas emissions 13 |
| | 3.2.2. Carbon dioxide emissions . 15 |
| | 3.2.3. Changes in CO2 emissivity factor 16 |
| | 3.3. NATIONAL EMISSION CAPS FOR 2008-2012 AND 2005-2007. 16 |
| | 3.4. HYPOTHETICAL EMISSION CAPS FOR 2005-2007 IN ACCORDANCE WITH THE KYOTO |
| | PROTOCOL. 17 |
| | 3.5. PROJECTED NATIONAL CO2 EMISSIONS IN ACCORDANCE WITH THE BASELINE |
| | SCENARIO (BLN) 17 |
| | 3.6. MAIN MACRO-ECONOMIC ASSUMPTIONS. 18 |
| | 3.7. BASELINE PATH FOR NATIONAL CO2 EMISSIONS 19 |
| | 3.8. PRINCIPLES APPLIED IN ESTABLISHING THE TOTAL POOL OF EMISSION ALLOWANCES. |
| | 20 |
| | 4. EMISSION NEEDS BY SECTORS IN 2005-2007 . 20 |
| | 4.1. SECTORAL AGGREGATION. 20 |
| | 4.2. INDICATORS OF THE GROWTH OF EMISSION NEEDS - COMPARISON 21 |
| | 4.3. SECTORAL ASSUMPTIONS 23 |
| | 4.3.1. Power plants. 23 |
| | 4.3.2. Combined heat and power plants 23 |
| | 4.3.3. Heat plants . 24 |
| | 4.3.4. Other than heat plants. 24 |
| | 4.3.5. Refinery products 26 |
| | 4.3.6. Coking plants . 26 |
| | 4.3.7. Iron and steel industry. 27 |
| | 4.3.8. Cement clinker production 27 |
| | 4.3.9. Lime production 28 |
| | 4.3.10. Production of glass including glass fibre . 29 |
| | 4.3.11. Production of ceramic products . 30 |
| | 4.3.12. Pulp and paper production. 30 |
| | 5. RULES OF NAP PREPARATION AND ALLOWANCE ALLOCATION. 31 |
| | 5.1. SECTORAL ALLOCATION . 31 |
| | 5.2. EMISSION FORECASTS FOR SECTORS . 32 |
| | 5.3. PRINCIPLES OF ALLOCATION AT INSTALLATION LEVEL . 33 |
| | 5.3.1. Grandfathering. 34 |
| | 5.3.2. Other allocation methods 35 |
| | 5.3.3. Early action bonus 35 |
| | 5.3.4. Allowance reserve . 36 |
| | 5.4. ALLOCATION AT SECTORAL LEVEL . 36 |
| | 5.5. RULES FOR SPECIAL ALLOCATION. 38 |
| | 5.5.1. Temporary exclusion from the scheme (Opt-out) 38 |
| | 5.5.2. Pooling . 38 |
| | 5.5.3. New entrants. 39 |
| | 5.5.4. Existing developing installations. 39 |
| | 5.5.5. Unidentified installations 39 |
| | 5.5.6. Enlarging and limiting the emission trading system . 39 |
| | 5.5.7. Limited verification ex post . 40 |
| | 5.5.8. Banking from the first to the second ETS period. 40 |
| | 5.6. ALLOWANCE TRANSFER 40 |
| | 6. BASIC BALANCE OF ALLOWANCES 41 |
| | 7. PUBLIC CONSULTATION PROCESS . 41 |
| | METHODOLOGICAL ANNEX . 43 |
| | Annexes attached in separate volume: |
| | - List of Installations included in the NAP (as for 29 July 2004) |
| | - List of Installations proposed for exclusion from the NAP in the first trading period (2005-2007) (as |
| | for 29 July 2004) |