| | STANDARDIZED UXO TECHNOLOGY DEMONSTRATION SITES |
| | 1,26 | | MB | HANDBOOK |
| | 199 | | stron |
| | 4471 | | ID | UNITED STATES ARMY CORPS OF ENGINEERS |
| | 2004 | | rok |
| | TABLE OF CONTENTS |
| | SECTION 1. INTRODUCTION |
| | 1.1 BACKGROUND 1 |
| | 1.2 OBJECTIVE 1 |
| | 1.3 STANDARDIZED SITES . 1 |
| | 1.4 PROGRAM GOALS . 2 |
| | SECTION 2. GUIDANCE FOR ESTABLISHING A STANDARDIZED UXO SITE |
| | 2.1 INTRODUCTION . 3 |
| | 2.2 SITE SELECTION CRITERIA . 3 |
| | 2.3 ROLES AND RESPONSIBILITIES . 4 |
| | SECTION 3. DOCUMENTATION FOR SITE PREPARATION |
| | 3.1 INTRODUCTION . 7 |
| | 3.2 MEMORANDUM OF UNDERSTANDING (MOU) 7 |
| | 3.3 SITE SELECTION DOCUMENTATION . 7 |
| | 3.4 SITE SUBMITTAL DOCUMENTATION 7 |
| | 3.5 PRECONSTRUCTION DOCUMENTATION . 7 |
| | 3.6 OBTAINING STANDARDIZED CLUTTER ITEMS AND TARGETS . 8 |
| | 3.7 CONSTRUCTION DOCUMENTATION . 9 |
| | 3.8 POST CONSTRUCTION DOCUMENTATION . 10 |
| | SECTION 4. CONSTRUCTION OVERVIEW |
| | 4.1 INTRODUCTION . 15 |
| | 4.2 SITE APPROVAL . 15 |
| | 4.3 DEVELOPING AND WRITING WORK AND HEALTH SAFETY PLANS 15 |
| | 4.4 SITE PREPARATION 15 |
| | 4.5 STANDARDIZED AND NONSTANDARDIZED TARGETS 16 |
| | 4.6 CLUTTER . 16 |
| | SECTION 4A. CONSTRUCTION OF THE CALIBRATION LANES TEST SITE |
| | 4A.1 INTRODUCTION . 19 |
| | 4A.2 PRESITE PREPARATION 19 |
| | 4A.3 ESTABLISHING THE CALIBRATION LANES . 21 |
| | 4A.4 SITE MAINTENANCE . 23 |
| | SECTION 4B. CONSTRUCTION OF THE GROUND TRUTH TEST PIT |
| | 4B.1 INTRODUCTION . 25 |
| | 4B.2 PRESITE PREPARATION 25 |
| | 4B.3 TEST PIT CONSTRUCTION 26 |
| | 4B.4 SITE MAINTENANCE . 27 |
| | SECTION 4C. CONSTRUCTION OF THE BLIND TEST GRID AREA |
| | 4C.1 INTRODUCTION . 29 |
| | 4C.2 SITE PREPARATION 29 |
| | 4C.3 SITE CORRECTION . 30 |
| | 4C.4 BLIND TEST GRID CONSTRUCTION 30 |
| | 4C.5 SITE MAINTENANCE . 32 |
| | SECTION 4D. CONSTRUCTION OF THE OPEN FIELD SITE |
| | 4D.1 INTRODUCTION . 33 |
| | 4D.2 PRESITE PREPARATION 33 |
| | 4D.3 SITE PREPARATION 34 |
| | 4D.4 OPEN FIELD CONSTRUCTION . 35 |
| | 4D.5 SITE MAINTENANCE . 35 |
| | SECTION 5. WEATHER AND SOIL MOISTURE DATA ACQUISITION SYSTEMS |
| | 5.1 INTRODUCTION . 37 |
| | 5.2 STANDARD METEROLOGICAL STATION CONFIGURATION 37 |
| | 5.3 TIME DOMAIN REFLECTOMETRY (TDR) MOISTURE METERS 39 |
| | 5.4 DATA ACQUISITION . 40 |
| | 5.5 DATA DISSEMINATION . 40 |
| | SECTION 6. SCHEDULING PROTOCOLS |
| | 6.1 GENERAL . 41 |
| | 6.2 INITIAL REQUEST 41 |
| | 6.3 THIRTY DAYS IN ADVANCE/SITE USAGE REQUIREMENTS 41 |
| | 6.4 FIELD COORDINATION . 42 |
| | SECTION 7. FIELD TESTING OPERATIONS AND OVERSITE PROTOCOLS |
| | 7.1 INTRODUCTION . 43 |
| | 7.2 ON-SITE PROJECT MANAGER RESPONSIBILITIES . 43 |
| | SECTION 8. TESTING PROCEDURES |
| | 8.1 INTRODUCTION . 47 |
| | 8.2 FIELD SCHEDULE 47 |
| | 8.3 FIELD DATA SUBMITTION 48 |
| | 8.4 POST-TEST OPERATIONS . 48 |
| | 8.5 PROCESSED DATA SUBMITTAL . 51 |
| | SECTION 9. SCORING PROTOCOLS |
| | 9.1 INTRODUCTION . 53 |
| | 9.2 SCORING OBJECTIVES . 53 |
| | 9.3 SCORING FACTORS 53 |
| | 9.4 DATA REQUIREMENTS FOR SCORING REPORT . 54 |
| | 9.5 DATA PROCESSING, ANALYSIS AND REPORTING . 57 |
| | 9.6 COMPARISION OF RESULTS 57 |
| | 9.7 TERMS AND DEFINATIONS . 57 |
| | SECTION 10. STANDARDIZED UXO TECHNOLOGY DEMONSTRATION SITE CLOSEOUT |
| | 10.1 INTRODUCTION . 61 |
| | 10.2 WORK PLAN AND HEALTH AND SAFETY PLAN . 61 |
| | 10.3 EQUIPMENT/MATERIALS NEEDED TO EXCAVATE THE TARGETS 61 |
| | 10.4 REMOVING EMPLACED TARGETS FROM THE CALIBRATION AND BLIND TEST AREAS 61 |
| | 10.5 REMOVING EMPLACED TARGETS IN THE OPEN FIELD SITE . 62 |
| | 10.6 COMPLETE TARGET PLACEMENT SUMMARY SHEET . 63 |
| | 10.7 CLOSEOUT REPORT 63 |
| | SECTION 11. APPENDIXES |
| | A CLUTTER AND ORDNANCE CHARACTERIZATION A-1 |
| | B MEMORANDUM OF UNDERSTANDING . B-1 |
| | C PROCEDURES AND EQUIPMENT FOR DEGAUSSING STANDARD TARGETS . C-1 |
| | D UXO WORK PLAN AND HEALTH AND SAFETY PLAN D-1 |
| | E SITE SURVEY E-1 |
| | F SPECIFICATIONS ON FIRST ORDER MARKER AND UTM FORMAT F-1 |
| | G SECONDARY DEBRIS CLEARANCE G-1 |
| | H SOIL SAMPLING AND ANALYSIS H-1 |
| | I BASELINE SURVEY I - 1 |
| | J CALIBRATION LANES LAYOUT . J - 1 |
| | K TARGET EMPLACEMENT (AUGER) . . K-1 |
| | L EXAMPLE LAYOUT OF A BLIND TEST GRID L- 1 |
| | M MOGUL DESIGN . M-1 |
| | N TARGET EMPLACEMENT (DRILL AND PUSH RIG) N-1 |
| | O SITE APPLICATION PROCESS AND FORMS . O-1 |
| | P SCORING . P-1 |
| | Q GLOSSARY OF TERMS . Q-1 |
| | R ABBREVIATIONS R-1 |
| | S DISTRIBUTION LIST S - 1 |