| | Baltic Ports Development Project (Kaliningrad Component) |
| | 1,65 | | MB | Environmental Impact Assessment |
| | 119 | | stron |
| | 5516 | | ID | Consulting Engineers and Planners A/S |
| | 2003 | | rok |
| | Table of Contents |
| | Executive summary 3 |
| | 1 Operational context 4 |
| | 1.1 Purpose and need 4 |
| | 1.2 Legal and institutional framework 4 |
| | 1.3 The project and the alternatives considered 11 |
| | 2 Description of the project 16 |
| | 2.1 Physical Construction 16 |
| | 2.2 Construction Phase 19 |
| | 2.3 Operation 20 |
| | 3 Description of the existing environment 21 |
| | 3.1 Climatic conditions 21 |
| | 3.2 Geomorphology and geology 22 |
| | 3.3 Surface water 26 |
| | 3.4 Landscape 60 |
| | 3.5 Terrestrial ecology and biotic resources 62 |
| | 3.6 Air quality 65 |
| | 3.7 Noise 65 |
| | 3.8 Socio-economic an cultural issues 65 |
| | 3.9 Land use and settlement patterns 66 |
| | 4 Description and assessment of the significant environmental impacts of the proposed operation |
| | at the local, regional and global levels 67 |
| | 4.1 Impacts associated with construction 67 |
| | 4.2 Impacts associated with operation 76 |
| | 4.3 Impacts associated with closure and decommissioning 84 |
| | 4.4 Identification of key uncertainties and data gaps 84 |
| | 4.5 Comparison of impacts associated with alternatives, including the do-nothing alternative 85 |
| | 5 Description of mitigation measures and/or measures to enhance environmental benefits 89 |
| | 5.1 Measures during construction 89 |
| | 5.2 Measures during operation 92 |
| | 5.3 Measures related to decommissioning 96 |
| | 5.4 Costs and financial provisions 97 |
| | 6 Environmental Action Plan 98 |
| | 6.1 Organisation and responsibilities 98 |
| | 6.2 Actions during the construction phase 99 |
| | 6.3 Actions during operation 103 |
| | 6.4 Reporting 112 |
| | Table of Appendices |
| | Annex 1: Names of those responsible for preparing the EIA |
| | Annex 2: Scoping Report |
| | Annex 3: Written material references used in preparing the EIA |
| | Annex 4: Records of public meetings and consultations in preparing the EIA |
| | Annex 5: Legal and institutional background |