| | Environmental Assessment for The Proposed Construction and |
| | 1,01 | | MB | Operation of a Biosafety Level 3 Facility at Lawrence Livermore |
| | 79 | | stron | National Laboratory, Livermore, California |
| | 6043 | | ID | U.S. Department of Energy |
| | 2002 | | rok |
| | Contents |
| | EXECUTIVE SUMMARY ii |
| | ACRONMYNS AND ABBREVIATIONS vii |
| | 1.0 PURPOSE AND NEED.1 |
| | 1.1 INTRODUCTION .1 |
| | 1.2 BACKGROUND2 |
| | 1.3 PURPOSE AND NEED FOR AGENCY ACTION.7 |
| | 1.4 PUBLIC INVOLVEMENT7 |
| | 1.5 COMMENT SUMMARIES AND NNSA RESPONSES 8 |
| | 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES .8 |
| | 2.1 PROPOSED ACTION TO CONSTRUCT AND OPERATE A BSL-3 FACILITY AT LLNL.8 |
| | 2.1.1 Proposed BSL-3 Facility Location and Construction Measures9 |
| | 2.1.2 BSL-3 Facility Description and Operations.12 |
| | 2.1.3 BSL-3 Facility Decontamination and Decommissioning .26 |
| | 2.2 ALTERNATIVE ACTION TO REMODEL/UPGRADE A SINGLE-ROOM LABORATORY IN |
| | BUILDING B-365 TO BSL-3 26 |
| | 2.3 ALTERNATIVE ACTION TO CONSTRUCT AND OPERATE AN ON-SITE CONSTRUCTED BSL-3 |
| | FACILITY.27 |
| | 2.4 NO ACTION ALTERNATIVE27 |
| | 2.5 ALTERNATIVES CONSIDERED BUT ELIMINATED FROM FURTHER ANALYSIS .27 |
| | 2.5.1 Construction and Operation of the Proposed BSL-3 Facility at Another Mainsite LLNL Location |
| | .27 |
| | 2.5.2 Construction and Operation of the Proposed BSL-3 Facility at Site 300 28 |
| | 2.5.3 Construction and Operation of the BSL-3 Facility at Another National Security Laboratory .28 |
| | |
| | 2.6 RELATED ACTIONS .28 |
| | 3.0 AFFECTED ENVIRONMENT29 |
| | 3.1 REGIONAL AND LOCAL SETTING.29 |
| | 3.1.1 Climate and Meteorology 29 |
| | 3.2 ENVIRONMENTAL RESOURCES NOT AFFECTED.31 |
| | 3.3 ENVIRONMENTAL RESOURCES POTENTIALLY AFFECTED32 |
| | 3.3.1 Ecological Resources.33 |
| | 3.3.2 Human Health 33 |
| | 3.3.3 Air Quality .33 |
| | 3.3.4 Noise 35 |
| | 3.3.5 Waste Management36 |
| | 3.3.6 Geology/Soils/Seismology.36 |
| | 4.0 ENVIRONMENTAL CONSEQUENCES.38 |
| | 4.1 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION.38 |
| | 4.1.1 Ecological Resources.38 |
| | 4.1.2 Human Health 39 |
| | 4.1.3 Air Quality .45 |
| | 4.1.4 Noise 46 |
| | 4.1.5 Waste Management47 |
| | 4.1.6 Geology/Soils/Seismology.47 |
| | 4.2 ANALYSIS OF ABNORMAL EVENTS AND ACCIDENT SCENARIOS48 |
| | 4.2.1 Site Preparation and Construction .48 |
| | 4.2.2 Operation48 |
| | 4.3 REMODEL/UPGRADE ALTERNATIVE55 |
| | 4.4 CONSTRUCT ON-SITE ALTERNATIVE 55 |
| | 4.5 ENVIRONMENTAL CONSEQUENCES OF THE NO ACTION ALTERNATIVE.55 |
| | 5.0 CUMULATIVE EFFECTS.56 |
| | 6.0 AGENCIES AND PERSONS CONSULTED57 |
| | 7.0 REFERENCES.58 |
| | APPENDICES |
| | A CDC GUIDANCE AND INFORMATION ON MICROORGANISMS A-1 |
| | A.1 CDC BIOSAFETY LEVEL CRITERIA A-2 |
| | A.2 CDC FACILITY REGISTRATION FOR TRANSFER OR RECEIPT OF SELECT AGENTS. A-16 |
| | A.3 BACKGROUND INFORMATION ON UNDERSTANDING INFECTIOUS MICROORGANISMS |
| | AND THE LLNL PROPOSED ACTION MICROORGANISMS A-20 |
| | B ABNORMAL EVENTS INFORMATION. B-1 |
| | B.1 POTENTIAL RISK TO WORKER -- LABORATORY-ACQUIRED INFECTION . B-2 |
| | B.2 POTENTIAL RISK TO NON-WORKERS FROM CONTACT WITH BIOSAFETY LABORATORY |
| | WORKERS . B-6 |
| | B.3 ACCIDENTS B-7 |
| | C PUBLIC COMMENTS C-1 |
| | C.1 RESPONSE TO PUBLIC COMMENTS LETTERS/EMAIL MESSAGES. C-1 |
| | C.2 PUBLIC COMMENT LETTERS/EMAIL MESSAGES. C-17 |