| | Juneau Airport Wind System (JAWS) Wind Sensor Severe |
| | 5,33 | | MB | Weather Performance Test Report |
| | 126 | | stron |
| | 6344 | | ID | U.S. Department of Transportation |
| | 2003 | | rok |
| | TABLE OF CONTENTS |
| | EXECUTIVE SUMMARY vii |
| | 1. INTRODUCTION 1 |
| | 1.1 Purpose of Report 1 |
| | 1.2 Scope of Report 2 |
| | 2. REFERENCE DOCUMENTS 2 |
| | 3. SYSTEM DESCRIPTION 4 |
| | 3.1 Mission Review 4 |
| | 3.2 Test System Configuration 4 |
| | 3.2.1 Test Site Description 4 |
| | 3.2.2 Test Bed Description 8 |
| | 3.3 Interfaces and Data Acquisition 20 |
| | 3.3.1 JWHIS Data Acquisition 20 |
| | 3.3.2 Test Data Acquisition 27 |
| | 4. TEST AND EVALUATION DESCRIPTION 32 |
| | 4.1 Wind Tunnel Testing 32 |
| | 4.1.1 Test Objectives and Criteria 32 |
| | 4.1.2 Testing Description 32 |
| | 4.1.3 Data Collection and Analysis Method 38 |
| | 4.1.4 Results/Discussion 38 |
| | 4.1.5 Conclusions 47 |
| | 4.2 Laboratory Mockup 47 |
| | 4.2.1 Test Objectives and Criteria 47 |
| | 4.2.2 Testing Description 48 |
| | 4.2.3 Data Collection and Analysis Method 48 |
| | 4.2.4 Results/Discussion 48 |
| | 4.2.5 Conclusions 48 |
| | 4.3 Field Test 48 |
| | 4.3.1 Test Objectives and Criteria 48 |
| | 4.3.2 Testing Description 50 |
| | 4.3.3 Data Collection and Analysis Method 51 |
| | 4.3.4 Results/Discussion 59 |
| | 4.3.5 Conclusions 106 |
| | 5. SUMMARY OF CONCLUSIONS 106 |
| | 6. RECOMMENDATIONS 107 |
| | 7. ACRONYMS AND GLOSSARY 107 |
| | APPENDIXES |
| | A Equipment List |
| | B Cabling Diagrams |