| | DESIGN: AIRCRAFT MAINTENANCE HANGARS: TYPE I AND TYPE II |
| | 2,29 | | MB |
| | 83 | | stron |
| | 6361 | | ID | Department of Defense |
| | 2004 | | rok |
| | CONTENTS |
| | CHAPTER 1 INTRODUCTION |
| | Paragraph 1-1 SCOPE 1 |
| | 1-1.1 Type I Hangar 1 |
| | 1-1.2 Type II Hangar. 1 |
| | 1-1.3 Other Aircraft Facilities 1 |
| | 1-1.4 Other Services’ Hangar Facilities 1 |
| | 1-2 OTHER DESIGN CONSIDERATIONS 1 |
| | 1-2.1 General Building Requirements. 1 |
| | 1-2.2 Specific Building Requirements. 1 |
| | 1-3 FACILITY PLATES 2 |
| | 1-4 PLANNING CRITERIA. 2 |
| | 1-5 BUILDING FUNCTIONS 2 |
| | 1-6 ENERGY CONSERVATION 3 |
| | 1-7 ENVIRONMENTAL CONCERNS 3 |
| | 1-7.1 AFFF Disposal. 3 |
| | 1-8 FIRE PROTECTION 3 |
| | 1-9 ANTI-TERRORISM/FORCE PROTECTION (ATFP). 3 |
| | 1-10 SUSTAINABLE DESIGN. 4 |
| | 1-11 ACCESSIBILITY 4 |
| | 1-12 FUNCTIONAL ANALYSIS CONCEPT DESIGN (FACD). 5 |
| | 1-13 DESIGN ISSUES. 5 |
| | 1-14 ACOUSTICS 5 |
| | 1-15 PROTECTED DISTRIBUTION SYSTEMS 5 |
| | 1-16 TELEPHONE AND OTHER COMMUNICATION SYSTEMS. 5 |
| | 1-17 WEAPONS AND AMMUNITION STORAGE. 6 |
| | CHAPTER 2 CIVIL DESIGN |
| | Paragraph 2-1 GENERAL 7 |
| | 2-2 ANTI-TERRORISM/FORCE PROTECTION 7 |
| | 2-3 HANGAR SAFETY CLEARANCE 7 |
| | 2-4 APPEARANCE 7 |
| | 2-5 RESTRICTIONS 7 |
| | 2-5.1 Construction in Floodplains or on Wetlands 7 |
| | 2-6 ENERGY CONCERNS 7 |
| | 2-7 WINDS. 7 |
| | 2-8 ACCESSIBILITY FOR THE DISABLED. 8 |
| | 2-9 SECURITY FENCING. 8 |
| | 2-10 LANDSCAPE PLANTING 8 |
| | 2-11 SOIL AND GROUNDWATER CONDITIONS. 8 |
| | 2-12 UTILITIES 8 |
| | 2-12.1 Underground Lines 8 |
| | 2-13 SECURITY. 8 |
| | 2-14 STORM DRAINAGE 9 |
| | 2-15 WATER SERVICE. 9 |
| | 2-16 SANITARY SEWER. 9 |
| | 2-17 AFFF CONTAINMENT 9 |
| | 2-18 VEHICULAR AND PEDESTRIAN CIRCULATION 9 |
| | 2-18.1 Street System 9 |
| | 2-18.2 Sidewalks. 9 |
| | CHAPTER 3 ARCHITECTURAL |
| | 3-1 GENERAL 10 |
| | 3-2 HANGAR BAY (TYPE I HANGAR) 10 |
| | 3-3 HANGAR BAY (TYPE II HANGAR). 10 |
| | 3-4 O1 SHOPS AND MAINTENANCE ADMINISTRATION. 11 |
| | 3-5 O2 SQUADRON ADMINISTRATION AND OPERATIONS. 11 |
| | 3-6 CONSTRUCTION FEATURES 11 |
| | 3-7 HANGAR. 11 |
| | 3-8 SURFACE TREATMENT. 12 |
| | 3-8.1 Specular Reflectance. 12 |
| | 3-8.2 Operational Hazard Glare 12 |
| | 3-9 WALL PANELS 12 |
| | 3-10 ROOF SYSTEMS 12 |
| | 3-10.1 Systems to Consider 13 |
| | 3-10.2 Other Alternatives 13 |
| | 3-10.3 Criteria to Consider 13 |
| | 3-11 HANGAR DOORS. 13 |
| | 3-11.1 Horizontal Sliding Hangar Doors. 13 |
| | 3-11.2 Vertical Lift Fabric Doors. 14 |
| | 3-12 PERSONNEL DOORS 15 |
| | 3-13 SECTIONAL OVERHEAD DOORS. 15 |
| | 3-14 OVERHEAD ROLLING SERVICE DOORS. 15 |
| | 3-15 NATURAL LIGHT 15 |
| | 3-15.1 Translucent Panels 15 |
| | 3-15.2 Windows 15 |
| | 3-16 LOUVERS 15 |
| | 3-17 HANGAR BAY FLOOR FINISH. 15 |
| | 3-18 O1 LEVEL (SHOPS AND MAINTENANCE ADMINISTRATION) 16 |
| | 3-18.1 Exterior Wall Construction. 16 |
| | 3-18.2 Wall Panels 16 |
| | 3-18.3 Personnel Doors 16 |
| | 3-18.4 Windows 16 |
| | 3-18.5 Louvers 16 |
| | 3-18.6 Miscellaneous Items 17 |
| | 3-19 INTERIOR MATERIALS AND SYSTEMS 17 |
| | 3-19.1 Floors. 17 |
| | 3-19.2 Walls and Partitions. 17 |
| | 3-19.3 Stairs 17 |
| | 3-19.4 Doors and Frames. 17 |
| | 3-19.5 Hardware. 17 |
| | 3-19.6 Windows and Glazing (Interior). 18 |
| | 3-20 FINISHES 18 |
| | 3-20.1 Bases. 18 |
| | 3-20.2 Walls 18 |
| | 3-20.3 Ceilings 18 |
| | 3-21 O2 (SQUADRON ADMINISTRATION AND OPERATIONS). 19 |
| | 3-21.1 Exterior Wall Construction. 19 |
| | 3-21.2 Wall Panels 19 |
| | 3-21.3 Windows 19 |
| | 3-21.4 Miscellaneous 19 |
| | 3-22 INTERIOR MATERIALS AND SYSTEMS 19 |
| | 3-22.1 Walls and Partitions. 19 |
| | 3-22.2 Stairs 19 |
| | 3-22.3 Doors and Frames. 20 |
| | 3-22.4 Hardware. 20 |
| | 3-22.5 Windows and Glazing 20 |
| | 3-22.6 Finishes. 20 |
| | 3-22.7 Additional Architectural Requirements. 21 |
| | 3-23 WEIGHT HANDLING EQUIPMENT. 22 |
| | 3-23.1 Bridge Cranes 22 |
| | CHAPTER 4 STRUCTURAL REQUIREMENTS |
| | 4-1 GENERAL 40 |
| | 4-2 MAIN STRUCTURAL FRAMING SYSTEMS. 40 |
| | 4-2.1 Cantilevered System 40 |
| | 4-2.2 Header Truss System 40 |
| | 4-3 MATERIALS 41 |
| | 4-3.1 Weathering Steel. 41 |
| | 4-3.2 Hollow Structural Sections. 41 |
| | 4-4 STRENGTH AND SERVICEABILITY REQUIRMENTS. 42 |
| | 4-4.1 Gravity loads 42 |
| | 4-4.2 Wind Loads 42 |
| | 4-4.3 Seismic Loads. 43 |
| | 4-4.4 Anti-Terrorism/Force Protection (ATFP) 44 |
| | 4-5 DESIGN AND CONSTRUCTION DOCUMENTATION 44 |
| | 4-5.1 Thermal Loads. 44 |
| | 4-5.2 Additional Cantilever Requirements 44 |
| | 4-5.3 Static Determinacy. 45 |
| | 4-5.4 Miscellaneous Considerations. 45 |
| | 4-5.5 Construction and Erection. 45 |
| | 4-5.6 Aerial Assembly with Shoring Towers. 46 |
| | 4-5.7 Economy of Framing Systems. 46 |
| | 4-5.8 Roof Systems 47 |
| | 4-5.9 Wall Systems. 48 |
| | 4-5.10 Floors. 49 |
| | 4-5.11 Doors. 50 |
| | CHAPTER 5 FIRE PROTECTION |
| | 5-1 GENERAL 51 |
| | 5-2 FIRE SUPPRESSION SYSTEM 51 |
| | 5-3 FLOOR DRAINAGE. 51 |
| | 5-4 DRAFT CURTAINS. 51 |
| | 5-5 O1/O1 LEVEL SPACES 51 |
| | 5-6 FIRE ALARM SYSTEMS. 51 |
| | 5-6.1 Hangar Bay Flame Detection. 51 |
| | 5-7 EMERGENCY SHUT-OFF STATIONS 52 |
| | 5-8 FIRE PUMPS. 52 |
| | 5-9 STRUCTURAL SYSTEM PROTECTION 52 |
| | 5-10 WATER SUPPLY. 52 |