| | MUSTARD AGENT TRIAL BURN PLAN FOR THE LIQUID |
| | 7,94 | | MB | INCINERATORS |
| | 333 | | stron |
| | 6557 | | ID | URS Corporation EG&G Division |
| | 2006 | | rok |
| | TABLE OF CONTENTS |
| | EXECUTIVE SUMMARY ES-1 |
| | TABLE OF CONTENTS i |
| | LIST OF APPENDICES. V |
| | LIST OF TABLES vi |
| | LIST OF FIGURES vi |
| | LIST OF ACRONYMS AND ABBREVIATIONS. vii |
| | LIST OF UNITS AND MEASUREMENTS x |
| | LIST OF CHEMICAL SYMBOLS AND FORMULAS .xi |
| | LIST OF IDENTIFICATION CODES FOR LIQUID INCINERATOR 1 INSTRUMENTS MONITORING |
| | REGULATED OPERATING PARAMETERS xiii |
| | LIST OF IDENTIFICATION CODES FOR LIQUID INCINERATOR 2 INSTRUMENTS MONITORING |
| | REGULATED OPERATING PARAMETERS.xiv |
| | 1.0 INTRODUCTION 1 |
| | 1.1 MUSTARD AGENT TRIAL BURN PLAN ORGANIZATION.2 |
| | 1.2 FACILITY INFORMATION3 |
| | 1.3 WASTE TREATMENT SYSTEM PROCESS AND FEED DESCRIPTIONS.3 |
| | 1.3.1 Waste Handling and Storage4 |
| | 1.3.2 Combustion Process4 |
| | 1.3.3 Pollution Abatement System.5 |
| | 1.3.4 Wet Scrubber Recirculation Brine Description6 |
| | 1.4 WASTES TO BE TREATED.6 |
| | 1.5 MUSTARD AGENT TRIAL BURN OBJECTIVES.10 |
| | 1.6 MUSTARD AGENT TRIAL BURN APPROACH.11 |
| | 1.7 PROPOSED MUSTARD AGENT TRIAL BURN PROGRAM.11 |
| | 1.8 MUSTARD AGENT TRIAL BURN SAMPLING AND ANALYTICAL PROTOCOLS12 |
| | 1.9 FINAL PERMIT LIMITS.13 |
| | 1.10 JUSTIFICATION FOR EXEMPTION13 |
| | 2.0 DETAILED ENGINEERING DESCRIPTION OF THE LIQUID INCINERATORS 14 |
| | 2.1 PRIMARY COMBUSTION CHAMBER .14 |
| | 2.2 SECONDARY COMBUSTION CHAMBER .16 |
| | 2.3 NOZZLE AND BURNER DESIGN17 |
| | 2.4 DESCRIPTION OF THE AUXILIARY FUEL SYSTEMS 18 |
| | 2.5 CAPACITY OF PRIME MOVER.20 |
| | 2.6 DESCRIPTION OF WASTE FEED SYSTEMS .20 |
| | 2.6.1 Agent Collection and Feed System .20 |
| | 2.6.2 Spent Decontamination Solution Feed System .21 |
| | 2.7 DESCRIPTION OF SLAG REMOVAL SYSTEM.21 |
| | 2.8 DESCRIPTION OF THE AUTOMATIC WASTE FEED CUTOFF SYSTEMS21 |
| | 2.9 EXHAUST GAS MONITORING EQUIPMENT26 |
| | 2.9.1 Continuous Emissions Monitoring Systems27 |
| | 2.9.2 Agent Monitoring Systems29 |
| | 2.10 POLLUTION ABATEMENT SYSTEM.32 |
| | 2.11 CONSTRUCTION MATERIALS .35 |
| | 2.12 LOCATION AND DESCRIPTION OF TEMPERATURE, PRESSURE, AND FLOW INDICATING |
| | AND CONTROL DEVICES.36 |
| | 2.12.1 Primary Combustion Chamber Agent Feed Rate Control39 |
| | 2.12.2 Primary Combustion Chamber Pressure Control 39 |
| | 2.12.3 Primary Combustion Chamber Exhaust Gas Temperature and Burner Controls39 |
| | 2.12.4 Secondary Combustion Chamber Exhaust Gas Temperature and Burner Control39 |
| | 2.12.5 Secondary Combustion Chamber Decon Waste Feed Control.40 |
| | 2.12.6 Slag Reservoir Shell Temperature40 |
| | 2.12.7 Quench Outlet Gas Temperature .40 |
| | 2.12.8 Quench Brine Flow .40 |
| | 2.12.9 Venturi Scrubber Brine Flow .41 |
| | 2.12.10 Brine pH41 |
| | 2.12.11 Brine Density.41 |
| | 2.12.12 Venturi Scrubber Differential Pressure.41 |
| | 2.12.13 Scrubber Tower Sump Level Control .41 |
| | 2.12.14 Clean Liquor Flow Control42 |
| | 2.12.15 Clean Liquor Level Control 42 |
| | 2.12.16 Clean Liquor pH Control 42 |
| | 2.12.17 Clean Liquor Density Control.43 |
| | 2.12.18 Demister Level Control .43 |
| | 2.12.19 Demister Candle Pressure Drop .43 |
| | 2.12.20 Liquid Incinerator Bleed Air Valve Operation44 |
| | 2.12.21 Liquid Incinerator Exhaust Gas Oxygen Concentration 44 |
| | 2.12.22 Liquid Incinerator Exhaust Gas Carbon Monoxide Concentration .44 |
| | 2.12.23 Liquid Incinerator Exhaust Gas Mustard Concentration44 |
| | 2.12.24 Liquid Incinerator Exhaust Gas Flow Rate45 |
| | 2.13 INCINERATION SYSTEM STARTUP PROCEDURES .45 |
| | 2.13.1 Startup of Utilities 45 |
| | 2.13.2 Startup of the Liquid Incinerator Pollution Abatement System 46 |
| | 2.13.3 Startup of the Secondary Combustion Chamber .47 |
| | 2.13.4 Startup of the Liquid Incinerator Primary Combustion Chamber.47 |
| | 3.0 SAMPLING AND ANALYSIS PROCEDURES. 48 |
| | 3.1 SAMPLING LOCATIONS.49 |
| | 3.1.1 Exhaust Gas Sampling Locations.49 |
| | 3.1.2 Process Stream Sampling Locations 54 |
| | 3.2 SAMPLING METHODS54 |
| | 3.2.1 Process Stream Sampling Methods 54 |
| | 3.2.2 Mustard Sampling Methods for Exhaust Gas.55 |
| | 3.2.3 Additional Sampling Methods for Exhaust Gas55 |
| | 3.3 ANALYSIS METHODS.56 |
| | 3.3.1 Analysis Methods for Mustard .56 |
| | 3.3.2 Analysis Methods for Process Stream Samples56 |
| | 3.3.3 Analysis Method for Slag Samples .56 |
| | 3.3.4 Analysis Methods for Exhaust Gas Samples.57 |
| | 3.4 AUDIT SAMPLES .57 |
| | 4.0 MUSTARD AGENT TRIAL BURN SCHEDULE . 58 |
| | 4.1 PERFORMANCE RUN SCHEDULE.58 |
| | 4.2 DURATION OF THE LIQUID INCINERATOR MUSTARD AGENT TRIAL BURN 58 |
| | 5.0 MUSTARD AGENT TRIAL BURN PROTOCOLS 60 |
| | 5.1 WASTE CHARACTERIZATION60 |
| | 5.1.1 Mustard Agent Waste Feed 60 |
| | 5.1.2 Metals Spiking Feed62 |
| | 5.1.3 Spent Decontamination Solution Waste Feed.62 |
| | 5.1.4 Surrogate Hazardous Air Pollutant Feed Stream 65 |
| | 5.2 PRINCIPAL ORGANIC HAZARDOUS CONSTITUENT SELECTION RATIONALE 65 |
| | 5.3 TEST PROTOCOL AND OPERATING CONDITIONS66 |
| | 5.3.1 Development of Worst-Case Criteria .66 |
| | 5.3.2 Liquid Incinerator Mustard Agent Trial Burn Operating Conditions 66 |
| | 5.3.3 Metals Spiking Operations .67 |
| | 5.3.4 Surrogate Hazardous Air Pollutant Feed Operations68 |
| | 5.4 COMBUSTION TEMPERATURE RANGES.68 |
| | 5.5 WASTE FEED RATES AND QUANTITIES OF WASTES TO BE BURNED.69 |
| | 5.6 EXHAUST GAS VELOCITY INDICATOR 70 |
| | 5.7 AUXILIARY FUEL .70 |
| | 5.8 WASTE FEED ASH CONTENT 71 |
| | 5.9 ORGANIC CHLORINE CONTENT OF THE WASTE FEED.71 |
| | 5.10 METALS FEED RATES .71 |
| | 5.11 POLLUTION CONTROL EQUIPMENT OPERATIONS73 |
| | 5.12 SHUTDOWN PROCEDURES.73 |
| | 5.13 INCINERATOR PERFORMANCE 74 |
| | 6.0 MUSTARD SHAKEDOWN PROCEDURES. 75 |
| | 6.1 STARTUP PROCEDURES AFTER AGENT CHANGE-OVER75 |
| | 6.2 MUSTARD SHAKEDOWN .76 |
| | 6.3 POST MUSTARD AGENT TRIAL BURN OPERATION.76 |
| | 6.4 INCINERATOR PERFORMANCE77 |
| | 7.0 MUSTARD AGENT TRIAL BURN SUBSTITUTE SUBMISSIONS 78 |
| | 8.0 MUSTARD AGENT TRIAL BURN RESULTS. 79 |
| | 9.0 FINAL OPERATING LIMITS 81 |
| | 9.1 ESTABLISHING LIQUID INCINERATOR OPERATING PARAMETERS .81 |
| | 9.2 GROUP A PARAMETERS82 |
| | 9.3 GROUP B PARAMETERS83 |
| | 9.4 GROUP C PARAMETERS84 |
| | 10.0 REFERENCES. 87 |
| | LIST OF APPENDICES |
| | APPENDIX A. LIQUID INCINERATOR QUALITY ASSURANCE PROJECT PLAN |
| | APPENDIX B. LIQUID INCINERATOR SHAKEDOWN PLAN |
| | APPENDIX C. MASS AND ENERGY BALANCE FOR THE LIQUID INCINERATOR MUSTARD |
| | AGENT TRIAL BURN AND EXHAUST GAS RESIDENCE TIME CALCULATIONS |
| | APPENDIX D. AUTOMATIC WASTE FEED CUTOFF TABLES AND OPERATING CONDITION |
| | TARGET VALUE TABLES FOR LIQUID INCINERATORS 1 AND 2 |
| | APPENDIX E. MUSTARD AGENT CHARACTERIZATION SUMMARY |
| | APPENDIX F. ALTERNATE MONITORING REQUESTS |
| | APPENDIX G. LIQUID INCINERATOR MUSTARD AGENT TRIAL BURN FINAL REPORT OUTLINE |
| | |
| | APPENDIX H. REFERENCED LIQUID INCINERATOR 1 DRAWINGS |
| | APPENDIX I. REFERENCED LIQUID INCINERATOR 2 DRAWINGS |